Our shop is in Schenectady. 2767 Curry Road. When you want a Level 2 charger in the city, we are not driving in from Albany. We are already here.
Choice Electric is family-owned and IBEW Local 236. We pull the city electrical permit. We meet the city inspector. Call or text (518) 952-0228.
City electrical permit and city inspection
The City of Schenectady runs its own electrical permit. It also runs its own inspection. That is not the town third-party list used in Rotterdam or Niskayuna. We file the permit. Then we call for inspection when the circuit is ready.
- City permit before we energize the charger.
- City inspector on the 240-volt homerun and the disconnect.
- We handle both so you are not on hold with City Hall.
1938 housing stock is the real job
Median year built in the city is about 1938. That number matters. It means 60-amp and 100-amp services. It means fuse boxes. It means Federal Pacific panels that should not get a 40-amp charger breaker. We look at the gear first. Then we talk charger.
If the panel has to change, read our county cost guide. Electrical panel upgrade cost in Schenectady County lays out the range. The electric panels page covers the work itself.
Stockade, Hamilton Hill, Mont Pleasant, Bellevue
Each neighborhood wires differently. Stockade houses are tight and old. Hamilton Hill often has small services and limited garage space. Mont Pleasant still hides fuse cabinets in basements. Bellevue mixed in later infill, so you may get a 150-amp panel next to a 60-amp neighbor.
- Stockade: long interior runs and little wall space for a connector.
- Hamilton Hill: confirm the service size before you buy a 48-amp unit.
- Mont Pleasant: fuse boxes and Federal Pacific are still in service.
- Bellevue: mixed ages, so we treat every house as its own job.
National Grid from Curry Road
Schenectady is National Grid. A charger on a healthy 200-amp service stays electrician-side. A service upgrade does not. We submit the load data. Then the utility sets the new service. Because we are local, we can meet their crew without a long drive.
Income programs, not invented rebates
EmPower+ is income-eligible. Confirm it at nyserda.ny.gov. NY Clean Heat pays HVAC, not the electrician who hangs your charger. Charge Ready NY 2.0 is commercial only. We will not pad a bid with a credit that does not exist.
Overnight Level 2 charging is still the goal. 4 to 8 hours on a dedicated 240-volt circuit. Brands we hang: Tesla, ChargePoint, Emporia, and a NEMA 14-50 when that is cleaner. More process detail lives on the EV charger installation hub.
Book the Schenectady charger from the shop
One-year parts and labor. 24-hour emergency. Email contact@choiceelectricllc.com. Choice Electric, 2767 Curry Road, Schenectady, NY 12303. Call (518) 952-0228.
